Denso Hall Rahguzar
On December 29th, 2020, the first segment of the terracotta cobble pavement on Marriot road was completed. The wiring work which started on 28th of December has moved to the next stage. K.E has started connecting wires to the recently installed pole. PTCL has shifted its booth connection to a new designated space.
Furthermore, the trenches on site that were previously lined by HF with bamboo panels have been plastered with mud lime plaster.